Saturday, 28 May 2011

Final fit out of the Hawkesbury River Bridges

Had a get together with the guys this afternoon to finish off the layout and to test every one's rolling stock.

After a few bugs were ironed out we managed to get some consistent running done. Whilst most of us were running, two of the guys were playing Vincent Vangough with a piece of cloth that was 12 meters long. They made an appearance after a couple of hours with the finished article, the back scene.

We temporarily held it up in place, and its definitely looks great. A big well done to Peter.

It should look even better at the show with the water in place.

Also managed to shoot a couple of video's as well that I will post on YouTube.


Until the next update.
Cheers
Alco

No comments:

Post a Comment