Tuesday, 3 May 2011

Perth show fast approaching

With the Perth show only 4 weeks away, it's time to start cleaning locos and rolling stock. With in excess of 150 peices to do, I will have to make sure that I start this soon.
Around 100 peices will be needed for the show, as with the "Hawesbury" being 12 meters long it will have a lot of spaces to be filled. Some of the other members of the MOAP are also busy dong there locos and rolling as well.

As for the "Hawkesbury" the ends are coming along quite well and Rodney has assured that the track laying is al most complete. For those that aren't in the know, the layout is a HO scale representation of the Hawkesbury River Bridges from tunnel to tunnel.
Photo of the Tree's waiting to be installed.